Fast, Reliable Garage Conversion ADU Across Sherman Oaks
A garage conversion ADU in Sherman Oaks typically runs $95,000-$185,000 all-in, from the permit set through final LADBS inspection, and the calendar is usually set by long-lead finishes rather than construction labor. We’re Nadia Ellery’s team at Ellery ADU Studio, and we’ve designed, permitted, and built garage conversion ADUs across Sherman Oaks since 2015 - from the flatland ranch streets south of Ventura Boulevard to the hillside parcels above Mulholland Drive. Our Garage Conversion ADU crews are dispatched from our Los Angeles office and serve Sherman Oaks locally, which means we understand the specific LADBS requirements, the R1 lot patterns, and the climate realities that shape every project here. Call (424) 325-4322 to schedule your free estimate - every project gets a written price before any work starts, per Haven Standard, Clause 1.
Why Ellery ADU Studio Glendale Is Sherman Oaks’s Preferred Garage Conversion ADU Company
We’ve completed over 900 ADUs across Los Angeles County since 2015, and a significant share of those have been garage conversions in Sherman Oaks’s 91403, 91423, and 91411 ZIP codes. Our clients here tend to be homeowners who bought between 2015 and 2025 at peak prices and are now converting detached two-car garages into rental income or family housing - they research extensively before calling, and they choose us because we name dollar ranges on the page and document every promise in writing.
Our response time to Sherman Oaks is same-day for initial consultations, and we maintain a documented photo record on every site visit - clients receive evidence of what we found and what we did, not a summary of how it felt. The 365-Day Done Right Promise is backed in writing before the project starts: if the finished ADU is not built to the permitted drawings, we make it right.
We’re familiar with the specific conditions that shape Sherman Oaks garage conversions: the 1950s-1960s ranch housing stock, the 60-100 amp electrical panels that almost always need upgrading, the San Fernando Valley heat that makes mini-splits a code necessity, and the sharp cost divide between flatland and hillside parcels. That local fluency means our permit sets move faster through LADBS and our quotes don’t surprise you mid-project.
A live person answers calls 24/7 at (424) 325-4322 - no voicemail queue, no callback promise that doesn’t materialize.
Our Garage Conversion ADU Services in Sherman Oaks

Detached Garage Conversion
Detached garage conversions are the dominant ADU type in Sherman Oaks, and for good reason: most post-WWII ranch homes here have two-car garages set deep on 6,000-9,000 sq ft R1 lots, and LADBS’s streamlined ADU ordinance allows 4-foot rear and side setbacks with no discretionary review. We handle the full design-build sequence - measured drawings, permit set, foundation assessment, electrical upgrade, and finish - under one contract at one written price. On hillside parcels above Mulholland, we verify VHFHSZ status before specifying any exterior finish, since ignition-resistant assemblies, Class A roofing, and ember-resistant venting can add $15,000-$25,000 in materials alone.

Attached Garage Conversion
Attached garages in Sherman Oaks are common in the 1950s tracts near Kester Avenue and the flatter sections of 91411. These conversions require careful fire-separation detailing between the primary residence and the new ADU, and we engineer that separation into the permit set from day one. The shared wall often contains the original electrical service, so we coordinate the panel upgrade and new sub-metering simultaneously with the framing inspection. Every attached conversion gets the same written price guarantee and documented photo record as our detached work.

Garage Partition & Bathroom Add
Some Sherman Oaks homeowners don’t need a full ADU - they need a partitioned garage with a bathroom add for a home office, studio, or guest suite that stays under the JADU size threshold. We design these conversions with wet-wall plumbing stacks that tie into existing sewer lines, and we specify tankless water heaters when the original gas service can’t support a second full appliance load. The permit path is lighter than a full ADU, but the documentation standard is identical: written price, photo record, 365-Day Done Right Promise.

Garage JADU
A Garage JADU in Sherman Oaks is limited to 500 square feet and must be contained within the existing garage footprint, but it avoids the full ADU utility-separation requirements and can share bathroom and kitchen facilities with the primary residence in certain configurations. This is the right tool for homeowners on tighter lots near the 405 corridor who want rental income without the full construction scope. We assess whether your existing slab, headroom, and access meet JADU criteria during the initial consultation, and we quote the project in writing before any design hours are billed.

Carport Conversion
Carport conversions in Sherman Oaks are less common than garage conversions, but they appear in the hillside neighborhoods above Beverly Glen where carports were built into sloped driveways in the 1960s. These projects almost always need new foundations and enclosed walls, which pushes them toward full ADU scope rather than JADU. We evaluate the existing slab depth, drainage pattern, and hillside stability before quoting - and we quote in writing, with no open-ended allowances.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Sherman Oaks
We specify and coordinate prefab and modular systems from Abodu, Cover, and Dvele within our single-contract design-build model, and we source James Hardie fiber-cement siding for custom garage conversions where the client wants a specific exterior finish that matches the primary residence. For Sherman Oaks projects, we maintain relationships with regional distributors who stock ignition-resistant assemblies and Class A roofing materials required for VHFHSZ parcels - this means we’re not waiting on special-order fire-rated materials when the permit is ready to pull. The brand specification happens during design, not as a post-permit surprise, and the price for every material is locked in writing before ordering.
Common Garage Conversion ADU Problems We See in Sherman Oaks Homes

- Foundation surprises on 1950s slabs. The post-WWII detached garages in Sherman Oaks were often poured as 4-inch non-structural slabs with no footing or rebar. We see contractors treat these as ADU-ready, then discover mid-project that the slab needs a full replacement after cabinets and glass are already ordered. We test the slab during our initial site visit and specify the foundation line item in the written quote.
- Electrical panels that can’t handle the load. Original 60-100 amp service was standard for Sherman Oaks ranch homes, and a new ADU with a mini-split, electric range, and tankless water heater typically needs 200 amps. We identify the panel upgrade requirement before permit submission and include it as a named line item, not a change order.
- VHFHSZ misclassification on hillside parcels. We’ve reviewed bids from other contractors who specified standard vinyl siding and conventional venting for garage conversions on streets above Mulholland, only to have LADBS reject the permit because the parcel sits in the Very High Fire Hazard Severity Zone. We verify VHFHSZ status at the address level before we specify a single finish.
- Long-lead items ordered before the price is fixed. Custom rift-oak millwork and architectural glass can carry 8-12 week lead times, and we’ve seen homeowners retain designers who order these items before the construction contract is signed - then absorb change-order costs when the design shifts mid-fabrication. We freeze the price in writing before any long-lead items are ordered, per Haven Standard, Clause 1.
Pricing for Garage Conversion ADU in Sherman Oaks, CA
Garage conversion ADUs in Sherman Oaks typically run $95,000-$185,000 all-in, from measured drawings through final inspection. The range reflects real variables: a flatland detached garage conversion with standard finishes and no foundation work lands in the $95,000-$125,000 band, while hillside parcels with VHFHSZ requirements, custom millwork, and architectural glass push toward $150,000-$185,000.
| Project Element | Typical Range in Sherman Oaks |
|---|---|
| Design & permit set | $8,000-$15,000 |
| Foundation repair/replacement | $12,000-$28,000 |
| Electrical panel upgrade (60/100A to 200A) | $4,500-$8,500 |
| Mini-split HVAC system | $6,000-$12,000 |
| VHFHSZ fire-hardening upgrade (hillside only) | $15,000-$25,000 |
| Custom millwork & cabinetry | $18,000-$45,000 |
| Architectural glass & specialty finishes | $8,000-$22,000 |
What moves the needle: hillside versus flatland location, foundation condition, electrical service capacity, and the lead time on custom finishes. We don’t use open-ended allowances or “call for pricing” - every project gets a written, line-item quote before any work begins, per Haven Standard, Clause 1. Call (424) 325-4322 for your free estimate.
We Also Serve Cities Near Sherman Oaks

Our Garage Conversion ADU in Sherman Oaks crews also work in Van Nuys, Studio City, North Hollywood, and West Hollywood - each with its own municipal code, LADBS district office, and local conditions that we account for in the permit set and pricing. The design-build model travels: one contract, one written price, documented photo record on every visit.
Serving Sherman Oaks, CA - Our Local Coverage Area
We’re based in the Sherman Oaks area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - Garage Conversion ADU in Sherman Oaks

Yes. Hillside parcels in LA’s Very High Fire Hazard Severity Zone require ignition-resistant exterior assemblies, Class A roofing, and ember-resistant venting that can add $15,000-$25,000 in materials alone compared to a flatland lot south of Ventura Boulevard. We verify your parcel’s VHFHSZ status at the address level before quoting a single finish, so the written price reflects the actual requirement. Call (424) 325-4322 for an exact quote - estimates are free.
On high-end Sherman Oaks garage conversions, the construction calendar is typically set by long-lead items - custom millwork and architectural glass often carry 8-12 week lead times - so we freeze the design and lock the price in writing before ordering anything. Under Haven Standard, Clause 5 (No Surprises), the scope is locked at signing; no door-side upsells, no scope creep. Call (424) 325-4322 to schedule your free estimate.
No. A 60-amp panel cannot safely support a new ADU with a mini-split, electric cooking, and standard lighting and outlet loads. We almost always specify a 200-amp service upgrade for Sherman Oaks garage conversions, and we include it as a named line item in the written quote - never as a mid-project change order. Call (424) 325-4322 for an exact quote - estimates are free.
A mini-split is required. The San Fernando Valley traps heat that the coastal basin doesn’t - Sherman Oaks regularly hits 100-108°F in summer - and LADBS energy code compliance plus basic habitability make a dedicated mini-split system a practical necessity, not a luxury. We specify and size the system during design and include it in the written price. Call (424) 325-4322 for an exact quote - estimates are free.
Yes, if the garage is 500 square feet or less and you meet the owner-occupancy and access requirements. A Garage JADU avoids full utility separation and can share certain facilities with the primary residence, but it must stay within the existing footprint. We assess your slab, headroom, and lot coverage during the initial consultation and quote both JADU and full ADU paths in writing so you can compare. Call (424) 325-4322 for an exact quote - estimates are free.
Written by Nadia Ellery, Owner at Ellery ADU Studio, serving Sherman Oaks since 2015.