A Ellery company - serving Glendale, CA
Ellery ADU Studio Glendale adu team

ADU Design & Permitting in Burbank - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates

ADU in Burbank, CA

Junior ADU and interior conversion in Burbank typically runs $85,000-$165,000 all-in, drawings through final inspection, while site prep and utility work adds $15,000-$55,000 depending on whether your existing panel and plumbing laterals can handle the load. Most Burbank homes in the Rancho, McCambridge, and Magnolia Park areas were built in the 1940s-1960s with sub-100-amp electrical panels and galvanized supply lines that must be upgraded before any ADU can pass occupancy. Because Burbank routes all electrical service through its own municipal utility, Burbank Water and Power, the interconnection workflow differs from SCE or LADWP territory and routinely trips up teams who don’t know the local sequence. Call (424) 325-4322 to schedule your free estimate.

Call (424) 325-4322

Why Burbank Homes Are Different

Burbank’s residential flatlands sit on 6,000-7,500 sq ft lots packed with post-WWII ranch-style homes and California bungalows, most with detached one- or two-car garages from the same era. That housing stock makes garage conversion ADUs the dominant project type, but it also means original galvanized plumbing, uninsulated walls, and electrical panels that cannot support a second dwelling unit without upgrade.

The eastern San Fernando Valley floor location pushes summer afternoons past 108°F during inland heat events, so mini-split sizing is not optional for rentable units. Properties near the Verdugo Mountains edge fall within a High Fire Hazard Severity Zone, triggering fire-resistive construction and defensible-space requirements that raise detached ADU costs for those parcels. Every electrical upgrade routes through BWP, with its own fee schedule, inspection cadence, and account-opening requirements separate from city building inspections.

Our Main Burbank Services

Most Burbank homeowners start with one of these three project types, each with its own dedicated page and local pricing.

ADU Design & Permitting in Burbank

We produce the full permit set, structural calculations, and BWP coordination documents as a single deliverable under one contract. Because we handle both design and build, there’s no designer-versus-builder gap when the city requests revisions. ADU Design & Permitting in Burbank covers every phase from feasibility study through certificate of occupancy.

ADU Design & Permitting in Burbank

Garage Conversion ADU in Burbank

Converting a 1940s-1960s detached garage in the Rancho or Magnolia Park neighborhoods means assessing slab thickness, ceiling height, and whether the existing foundation meets current code for habitable space. We quote the full scope, including panel upgrades and BWP meter sets, in one written price before work starts. Garage Conversion ADU in Burbank details the complete process.

Garage Conversion ADU in Burbank

New Detached ADU in Burbank

Building new on a Burbank lot requires navigating setback rules, fire-zone requirements for hillside parcels, and BWP service extensions that can add weeks if not sequenced correctly with the building permit. Our permit set includes the electrical service coordination documents from day one. New Detached ADU in Burbank explains the full timeline and cost structure.

New Detached ADU in Burbank
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (424) 325-4322

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Junior ADU & Interior Conversion in Burbank

HVAC technician installing air conditioning unit during garage conversion project
Junior ADU & Interior Conversion in Burbank

Junior ADU and interior conversion in Burbank solves a specific problem for homeowners who need rental income or family housing but lack the budget or lot space for a detached unit. The 1940s-1960s housing stock in neighborhoods like the Rancho and McCambridge areas offers ideal candidates: spare bedrooms, underused basements, and above-garage spaces that can become independent dwelling units without expanding the building footprint. Because these projects work within existing envelopes, they avoid the fire-zone complications and setback battles of hillside detached ADUs, though they still require BWP electrical upgrades and full permit sets. Junior ADU & Interior Conversion covers our full approach to these projects.

Room-to-ADU Conversion

Signs you need it

You have a 200+ sq ft spare bedroom or den with direct exterior access and want a self-contained rental unit without building outward.

What it costs in Burbank

Room-to-ADU conversions in Burbank typically run $85,000-$140,000 all-in, including the required kitchenette, full bath, separate entrance, and BWP electrical upgrade.

How we do it

We measure existing conditions, produce the permit set with fire-separation details, coordinate the BWP panel upgrade, and build to the drawings under our single contract.

Interior JADU

Signs you need it

You need a compact, lower-cost unit inside your existing home for family or rental income, with the owner-occupancy requirement that defines a Junior ADU under state law.

What it costs in Burbank

Interior JADUs in Burbank typically range $75,000-$125,000, including the efficiency kitchen, separate entrance, and BWP service coordination.

How we do it

We design within the 500 sq ft maximum, produce the JADU-specific permit set, and build to the signed scope with no change orders per Haven Standard Clause 5.

What Junior ADU & Interior Conversion Costs in Burbank

Item Typical range in Burbank
Room-to-ADU conversion (all-in) $85,000 - $140,000
Interior JADU (all-in) $75,000 - $125,000
Above-garage ADU (all-in) $110,000 - $180,000

Does a Junior ADU require a separate electrical meter in Burbank?

No, state law allows JADUs to share the primary residence’s electrical service, though BWP may require a sub-panel or load calculation to confirm capacity. Call (424) 325-4322 for an exact quote - estimates are free.

Can I convert any room in my Burbank home to an ADU?

Not every room qualifies - the space needs exterior access, sufficient ceiling height, and compliance with fire-separation requirements between units. We assess feasibility during our first site visit and document what we find with photos.

ADU Site Prep & Utilities in Burbank

Professional designer drawing ADU floor plans with handbook and calculator
ADU Site Prep & Utilities in Burbank

ADU site prep and utilities in Burbank almost always means electrical panel upgrades and plumbing lateral work before construction can begin, because the 1940s-1960s housing stock was never designed for a second dwelling unit. BWP’s municipal utility status adds a specific wrinkle: contractors must open a BWP account and schedule BWP-specific electrical inspections independently of city building inspections, and teams accustomed to SCE or LADWP workflows consistently miss this step. ADU Site Prep & Utilities details our full prep and utility coordination service.

Electrical Panel Upgrade

Signs you need it

Your existing panel is rated below 200 amps, has no spare breaker spaces, or still uses fuses rather than breakers.

What it costs in Burbank

Electrical panel upgrades in Burbank typically run $4,500-$9,500, including the BWP permit, meter socket, and coordination with city electrical inspections.

How we do it

We open the BWP account, submit the load calculation, install the new panel and grounding system, and schedule the BWP inspection before final city inspection.

Plumbing Lateral

Signs you need it

Your home has original galvanized supply lines, visible corrosion at fixtures, or water pressure below 40 PSI when multiple taps run.

What it costs in Burbank

Plumbing lateral replacement in Burbank typically costs $6,500-$14,000 depending on trench length, pavement restoration, and whether the sewer lateral must also be replaced.

How we do it

We video-inspect the line, produce the trenching plan with utility clearance, replace with copper or PEX, and pressure-test before backfill.

What ADU Site Prep & Utilities Costs in Burbank

Item Typical range in Burbank
Electrical panel upgrade $4,500 - $9,500
Plumbing lateral replacement $6,500 - $14,000
Foundation and grading (new detached) $12,000 - $28,000

Does BWP require a separate account for my ADU?

For detached ADUs, yes - BWP requires a separate service account and meter set, which we coordinate as part of our single-contract scope. Call (424) 325-4322 for an exact quote - estimates are free.

How long does utility prep take before construction starts?

Utility prep typically adds 3-6 weeks before breaking ground, with BWP electrical inspections often the pacing item due to their independent scheduling system.

Get the price in writing before anything starts.Serving Burbank - a real person answers, day or night.
Call now

Brands We Service in Burbank

We specify and coordinate prefab and modular systems from Tuff Shed, James Hardie, Abodu, and Cover within the same single contract, so the design, permit set, and brand-specific installation are one written price with no gap between designer and builder. Our brands page lists full compatibility and lead times.

Pricing for ADU in Burbank, CA

Professional designer reviewing ADU blueprints and permitting documents with a client
Pricing for ADU in Burbank, CA
Service Typical range in Burbank
Interior JADU (all-in) $75,000 - $125,000
Room-to-ADU conversion (all-in) $85,000 - $140,000
Above-garage ADU (all-in) $110,000 - $180,000
Basement ADU (all-in) $95,000 - $165,000
Attached addition ADU (all-in) $120,000 - $200,000
Electrical panel upgrade $4,500 - $9,500
Plumbing lateral replacement $6,500 - $14,000
Foundation and grading (new detached) $12,000 - $28,000
Gas line extension $3,500 - $8,500
Landscaping and hardscape (post-build) $8,000 - $22,000

Prices in Burbank push toward the higher end when BWP requires service upgrades, when hillside fire-zone parcels trigger additional materials, or when original 1940s-1960s infrastructure needs full replacement rather than selective upgrade. Under Haven Standard Clause 1, every project receives a written price before any work begins - no call-for-pricing, no open-ended allowances.

Neighborhoods We Serve in Burbank

We work across Burbank’s residential flatlands and hillside edges, from the post-WWII ranch neighborhoods to the bungalow courts of Magnolia Park. Dispatch and scheduling are coordinated from our Los Angeles office; crews serve Burbank locally with same-week site visits typically available.

  • Rancho
  • McCambridge
  • Magnolia Park
  • Burbank Hills
  • Media District (residential pockets)

Service Area - Cities Near Burbank

Professionals working on ADU design and permitting plans at a desk
Service Area - Cities Near Burbank

Our crews work throughout the San Fernando Valley and adjacent communities. Homeowners in Glendale, CA, North Hollywood, CA, Studio City, CA, and Van Nuys, CA use the same design-build team, the same BWP coordination experience, and the same written-price guarantee.

Serving Burbank, CA - Our Local Coverage Area

We’re based in the Burbank area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU in Burbank

Professional applying spray foam insulation for garage conversion ADU project
FAQs About ADU in Burbank

Ready to get started? Free estimates · Written quotes before work starts response in Burbank
Call (424) 325-4322

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Burbank Customers Say

★★★★★ 5.0 from 4+ reviews

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

- Odette N.

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

- Mireille T.

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

- Arjun D.

How It Works in Burbank

Getting your adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Burbank - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

Request a Free Estimate

Tell us what's going on in Burbank - we'll get back to you fast. No obligation.

By submitting this form, you agree to our Privacy Policy and authorize us to contact you by phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch